Correspondence & Applications
Humboldt County Conditional Use Permit
NDEP Bureau of Air Pollution Control
NDEP Bureau of Waste Management
Correspondence
- Application Incomplete Letter
- Response to NDEP Completeness Review
- Application Complete Letter Jan 2009
- Technical Comments from NDEP
- Response to Technical Comments May 2009 - Transmittal Letter
- Revised Permit Documents - Transmittal Letter April 2010
- Modifications to Application - Transmittal Letter April 2010
Application Materials
Jungo Landfill Application
Volume I
- Report of Design - Revision 3 (April 2010)
- Tables
- Figures [Site Plans, Groundwater Basin Map, borings etc.]
- Jungo Figure 1 - Site Location Map
- Jungo Figure 2 - Site Property Map Layout
- Jungo Figure 3 - Regional Geologic Map
- Jungo Figure 4 - Site Exploration Plan
- Jungo Figure 5 - Geologic Section A - A
- Jungo Figure 6 - Geologic Section B - B Layout
- Jungo Figure 7 - Regional Groundwater Elevations
- Jungo Figure 8 - Groundwater Elevation Trends
- Jungo Figure 9 - Regional Wells Location
- Jungo Figure 10 - Site Groundwater Contour Map
- Jungo Figure 11 - Base Grading Plan
- Jungo Figure 12 - Cover Grading Plan
- Jungo Figure 13 - Site Facilities Plan
- Jungo Figure 14 - Landfill Gas Monitoring Network
- Jungo Figure 15 - Landfill Gas Monitoring Probe Detail
- Appendices
- Appendix A - Summary Boring Logs
- Appendix B - Geotechnical Laboratory Results
- Appendix C - Historical Groundwater Elevation Study
- Appendix D - Slug Test Data
- Appendix E - Foundation Settlement Calculations
- Appendix F - Slope Stability Calculations
- Appendix G - Leachate Generation Calculations
- Appendix H - Cover Erosion Calculations
- Appendix I - Post Closure Settlement Calculations
- Appendix J - Preliminary Surface Water Calculations
Volume II
- Site Development Drawings (Revised April 2010)
- Jungo Drawing 01 - Drawing Index (Revised April 2010)
- Jungo Drawing 02 - Site Plan
- Jungo Drawing 03 - Landfill Base Grading Plan
- Jungo Drawing 03A - Base Grading Plan 1 (Revised April 2010)
- Jungo Drawing 03B - Base Grading Plan 2
- Jungo Drawing 03C - Base Grading Plan 3
- Jungo Drawing 03D - Base Grading Plan 4
- Jungo Drawing 03E - Basin Plan
- Jungo Drawing 04 - Liner & LCRS Details (Revised April 2010)
- Jungo Drawing 05 - Final Cover Grading Plan
- Jungo Drawing 05A - Final Cover Grading Plan 1
- Jungo Drawing 05B - Final Cover Grading Plan 2
- Jungo Drawing 05C - Final Cover Grading Plan 3
- Jungo Drawing 05D - Final Cover Grading Plan 4
- Jungo Drawing 06 - Preliminary Landfill Gas Collection Plan
- Jungo Drawing 07 - Surface Water Drainage Plan
- Jungo Drawing 08 - Final Cover Details (Revised April 2010)
- Jungo Drawing 09 - Cross Sections
- Jungo Drawing 10 - Initial Cell Development Plan
- Jungo Drawing 11 - Cell Development Plan - End of Year 10
- Jungo Drawing 12 - Cell Development Plan - End of Year 25
- Jungo Drawing 13 - Cell Development Plan - End of Year 50
- Jungo Drawing 14 - Cell Development Plan - End of Year 75
- Jungo Drawing 15 - Cell Development Cross Sections 1
- Jungo Drawing 16 - Cell Development Cross Sections 2
Volume III
Other
- PowerPoint presented at the August 3, 2009 Humboldt County Commission meeting*
(*Numbers updated as of October 2009) - PowerPoint by Recology presented at the January 12, 2010 Humboldt Development Authority meeting
- PowerPoint by Golder Associates, Inc. presented at the January 12, 2010 Humboldt Development Authority meeting